Boxi oil and gas processing plant is the downstream project of Boxi OilField Group. In order to meet the unified planning of Tianjin Binhai new area government and the economic construction of local government, and to eliminate potential security risks. In 2013, the boxi plant terminal was relocated to the Southport industrial area, where laying a 12′′ single layer concrete counterweight layer gas pipeline and a 10′′/16′′ double layer oil-water mixed pipeline were installed to the new terminal.

 

As a practical enterprise with 20 years’engineering experience, River Machinery has participated in some important projects of reconstruction.

The construction section is shown in the picture below: